Engineering Design Flaw Blamed For Brewery Construction Complications

ByVictoria Negron

|

Updated onJune 29, 2018

This case involves the design and construction of a microbrewery in Massachusetts. The microbrewery project director hired a construction company who claimed to have extensive experience designing and constructing this type of facility. The construction company also claimed to be the industry leader in designing custom microbrewery equipment. The microbrewery project director elected to have both the facility and its equipment designed and engineered by the construction company. Once construction of the facility began, the project was delayed for several months due to an alleged design deficiency. The construction contractor claimed a few design issues needed to be resolved in order for all the equipment to fit comfortably inside the facility. During the subsequent equipment installation, it was discovered that the facility had not been designed with adequate space for the equipment to be installed. An expert with experience designing, building, and engineering brewery plants was sought to review the evolution of the project and opine on the adequacy of the contractor’s work.

Question(s) For Expert Witness

1. Please briefly describe your engineering, design, and construction experience as it relates to manufacturing facilities?

2. Do you have experience as a project manager or engineer working on constructing a manufacturing facility?

Expert Witness Response E-008230

inline imageI have experience at a top multidisciplinary engineering consulting and technical services company. I have served as an automation equipment design engineer, a brewery equipment engineer, a sawmill equipment engineer, and I have worked on various process engineering assignments. All of these roles have involved careful analysis of the construction and layout of manufacturing facilities. I have extensive experience analyzing existing facilities to determine necessary construction alterations and necessary equipment installation. My work with industrial plants in the litigation realm has primarily involved installation and safety issues. I am well aware of the issues present in this case. I am very capable of looking at the history of the design on the project, how the design has changed, and whether or not the plaintiff was given adequate design specifications to create an appropriate manufacturing facility.

About the author

Victoria Negron

Victoria Negron

Victoria Negron has extensive experience in journalism and thought leadership in the legal space, with a background crafting content, whitepapers, webinars, and current event articles pertaining to the role of expert witnesses in complex litigation matters. She is a skilled professional specializing in B2B product marketing and content marketing. Currently, she serves as an Enterprise Product Marketing Manager at Postman, and previously held the position of Technical Product Marketing Manager at Palantir Technologies, where she developed her skills in launch strategies, go-to-market strategy, and competitive analysis.

Her expertise in content marketing was further refined during her tenure at the Expert Institute, where she progressed from a Marketing Writer to Senior Content Marketing Manager, and eventually to Associate Director of Content & Product Marketing. In these roles, she honed her abilities in digital marketing, SEO, content strategy, and thought leadership.

Educationally, Victoria holds a Master of Business Administration from the University of Florida - Warrington College of Business and a Bachelor of Arts in Literature, Art, and Hispanic Studies from Hamilton College. Her diverse educational background and professional experience have equipped her with a robust skill set in product marketing, content development, and strategic marketing initiatives.

Find an expert witness near you

What State is your case in?

What party are you representing?

background image

Subscribe to our newsletter

Join our newsletter to stay up to date on legal news, insights and product updates from Expert Institute.